Decoration Process of Blank House

by Jennifer Cameron inEuropean Style

Nowadays, blank houses are popular with everyone. You can decorate it according to your own preferences. And you can choose its own decoration materials. You can decorate it by yourself or find a decoration company or designer. Understanding the process of decorating the house can make each process cooperate.

The first is the preliminary design. It is the foundation and core of the decoration process. The preliminary design includes measurement and design drawing. If you look for a designer or decoration company, you have to submit a budget. And you need to sign a decoration design contract. The measurement includes the area involved in decoration. It is necessary to specify the size of the main wall surface. You can buy accurate building materials. And you can estimate the required expenditure in advance.

Then it enters the construction stage. The first thing to do is to demolish and change the main body of the blank house. When dismantling the wall here, the non-load-bearing wall is detachable. It should be reported to the property before dismantling. Load-bearing walls cannot be dismantled. It is better not to dismantle those that cannot distinguish the nature of the walls. After disassembly and modification, the cabinet should be measured for the first time. You can find out whether the socket, water meter and water inlet of the range hood are located. After that, hydro power renovation will be carried out. After the renovation is completed, remember to carry out the suppression test. At this stage, the purchase of wall tiles and floor tiles can be arranged. The bricklaying process can be carried out after the hydro power renovation is completed.

In the process of bricklaying, carpenters, bricklayers and oilmen came out one after another. Carpenters make and install fixed cabinets. Some carpenters have to cover risers, suspended ceilings, plaster lines and find equal jobs on the ground. At this time, the floor drain needs to be bought well. When the carpentry is finished, the tile union will carry out tile work. Floor drains should be installed with floor tiles. Bricklayers should install gate stones and marble windowsills. After the bricklayer is finished, the cabinet can be measured for the second time. For some embedded household appliances, the size should be measured at this time. After that, the oilman painted some wooden furniture and walls. Oil workers should do basic treatment on the wall surface where wallpaper is planned. Remember to avoid rainy and humid weather during painting.

Furniture, electrical appliances and soft assembly decorations can be installed. Water heaters, suspended ceilings, gas stoves, indoor doors and floors are installed in an order manner. On the second day after the floor is installed, wallpaper can be laid. Sockets and lamps can be completed before all household appliances are installed. After everything is over, it can be installed. It can be moved in after about half a year of ventilation.

The decoration process of blank house is to plan the sequence and control the decoration rhythm. Everyone has their own unique design and ideas. The decoration after staying can be played by their own preferences.